Every furnace is eventually replaced. The difference between doing it on a schedule and doing it during a failure is larger than most people expect, and very little of it is the equipment price.

What an emergency replacement gives up
The load calculation. There is no time, so the replacement matches the old unit — which was probably oversized, and now the error is locked in for another twenty years.
The second quote. One contractor, one price, taken because the house is cold.
Equipment choice. Whatever the distributor has in stock in roughly the right size. Staging, efficiency tier and blower type are decided by availability rather than by the house.
Scheduling leverage. Winter is peak season. Rates are higher and the best crews are booked.
The chance to do adjacent work. Duct sealing, a coil replacement, an orphaned water heater — all of which are much cheaper while the system is already open, and none of which happens on an emergency call.
What a planned replacement gets
A Manual J calculation, which for heating is straightforward and which will very likely justify a smaller furnace.
Three quotes, comparable because there was time to specify the scope.
The equipment you chose, including staging and blower type, ordered rather than grabbed.
Shoulder-season pricing and a crew that is not working its fourth no-heat call of the day.
The related work done at the same time.
When to start
A furnace over fifteen years old that has begun needing repairs is the signal. So is a second repair in one season, or any repair over a threshold that would be a meaningful fraction of a replacement.
At that point the decision is not whether but when, and the answer is spring or early autumn rather than the following January.
Reducing the risk of a failure in the meantime
Annual service before the season, with combustion analysis, which finds most of what is about to fail.
Change the filter on schedule. Restricted airflow causes high-limit trips and heat exchanger stress, and it is the most common self-inflicted failure.
Keep the vent terminations clear in snow.
Working carbon monoxide alarms, regardless.
Having a plan on paper
The useful thing to have ready is a small file: the load calculation, the preferred equipment, and a contractor already chosen.
If the furnace does fail unexpectedly, that file converts an emergency into a phone call. The size is known, the model is known, and the decision has already been made in a warm house rather than a cold one.
Temporary heat
Where a failure does happen, a few electric heaters will keep a house habitable and the pipes safe for a day or two, which is often enough to avoid taking the first available quote.
That is worth knowing, because the pressure to decide immediately is what produces the expensive outcome, and it is usually a smaller pressure than it feels like at the time.
The one thing that is not different
The work itself. A furnace installed carefully in January is as good as one installed carefully in May.
What differs is the size, the specification, the price and the scope — and those are decided before the crew arrives, which is exactly why the timing matters.
Frozen pipes are the real deadline
The reason an emergency feels like an emergency is not comfort, it is the plumbing.
A house in a cold snap without heat is at risk within a day, and the risk is concentrated in pipes running through exterior walls, unheated crawl spaces and garages.
Knowing where those runs are, and being able to keep those specific areas above freezing with a couple of heaters, converts a hard deadline into a soft one and is what buys the time to get a second quote.
Off-season promotions are real
Manufacturers and distributors run rebates in spring and autumn precisely because that is when demand is low.
Stacked with utility rebates and federal credits, an off-season replacement can cost meaningfully less than the same equipment in January — before counting the difference in labour rates.